Uview Airlift II HD Manuel d'utilisateur

Naviguer en ligne ou télécharger Manuel d'utilisateur pour Pour la voiture Uview Airlift II HD. UView Airlift II HD User Manual Manuel d'utilisatio

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 1
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 0
INSTRUCTIONS FOR COOLANT FILL TOOL
Please read the following before using this tool:
Install an air line nipple (not supplied) to the shutoff valve.(Note: Hold the
ball valve body assembly with a wrench during air line nipple installation to
avoid damage to the Venturi assembly)
Install the cone adapter to the elbow fitting
Push the furnished refill hose onto the barbed fitting on the coolant fill tool
Minimum shop air required is 90 psi (6 BAR) and should have an air dryer
system
NOTE: For best results, the radiators should be completely drained
NOTE: In bus applications, it is recommended to close the heater shutoff
valves when initially draining the system
Refilling Instructions:
1. Insert the coolant fill tool cone adapter into the radiator service neck or reservoir
tank.
2. Make sure the refill hose valve (blue lever) is closed. (Fig.1)
3. Insert the filter end of the refill hose into the coolant container. It is
recommended to draw from more coolant than required. (Fig.2) NOTE: Models
equipped with an additional overflow tank require that hoses to the tank be
clamped shut prior to the next step.
4. Connect shop air to the Venturi assembly and then open the ball valve (red
lever).You will hear a hissing noise as the tool begins to pull a vacuum.
5. With the ball valve (red lever) left open, open the refill valve (blue lever) slightly
and close as soon as coolant has filled the hose. (This is done in order to remove
air from the fill hose). At this time, the fill tool no longer needs to be monitored
and the vacuum gauge pointer will begin to rise after a short period. (Fig.3)
NOTE: Radiator and heater hoses may start to collapse. This is normal due to
vacuum draw.
6. Depending on the size of the cooling system, a typical gauge reading of 25 or
higher should be reached within 2 – 3 minutes. (The gauge reading may be
slightly less in higher elevations but a proper vacuum should still be reached
within 3 minutes).
7. Once the gauge has reached the desired vacuum level, close the vacuum air
supply
valve (red lever) and let the system sit for 20 seconds to observe for a
drop in
vacuum. A drop in the gauge reading indicates a vacuum leak in the
system.
8. Open the refill valve (blue lever) and the coolant will start to fill the cooling
system. A system without a vacuum leak will fill in about 4 minutes. (Fig.4)
NOTE: If the refill tube end comes out of the coolant during the refill process,
air will be pulled into the system and the entire procedure will need to be
repeated.
9. Disconnect the airline and remove the fill tool. NOTE: Overflow tanks should
be
filled to proper level. Top off cooling system if necessary.
#
99080801
Rev.0
-
1
Vue de la page 0
1

Résumé du contenu

Page 1

INSTRUCTIONS FOR COOLANT FILL TOOL Please read the following before using this tool: • Install an air line nipple (not supplied) to the shutoff val

Commentaires sur ces manuels

Pas de commentaire